Projects and Achievements...

  • LBG Office Consolidation Project

    ...involved approximately 11,000 moves and a total of 17 Head Office buildings. Cubic provided occupancy surveys, from which OCCUPi block plans were produced to assist the project at all stages.

    Read More
  • Land Securities Head Office Re-Stack

    ...involved approximately 500 moves over 8 floors. Our OCCUPi service planned and illustarted the building re-stack in one afternoon, complete witrh departmantal allocation and fesibilities options, ready for executive sign off.

    Read More
  • RBS Interior Partitions Project

    ... involved delivering a solid and glazed partitioning programme with specific focus on value engineering and re-using other manufacturers elements. Our selection was based on high sound performance, re-configurability and the ability to adpat our systems to match existing... saving cost & time.

    Read More
  • LBG Re-fit Change Consultancy

    ... we were engaged by the bank to provide a Change Management role for the complete re-fit of a major Head Office building with more than 2,000 staff. The aims were to provide new ways of working with both Agile & Collaborative formats at ratio for the prediminatly IT related population.

    Read More
  • Halifax HBOS Occupancy Surveys

    ... we were engaged by the merging corporations to help understand occupancy levels within 4 Head Office buildings. We started with outdated information, which meant that a manual survey had to take place to assess the accuracy of the plans.

    Read More
  • Barclays Bank Branch of the Future Project

    ... we were engaged by Barclays to initially build a mezzanine floor in order to achieve a 'proof of design concept build'. We have sinse supplied their branches with over 8'000 staff lockers as part of their ongoing branch project model.

    Read More
  • RBS Roller Racking Systems

    ... the RBS project management team approached Cubic with a requirement to store high levels of storage within a restricted area on a light duty floor. Cubic responded with a proposal to install an alluminium roller racking sytstem. The strong but light alluminium system achieved the strict floor loading requirements.

    Read More
  • University of East London Space Planning

    ... we were engaged to provide a partitioning solution at their docklands campus which they were re-fitting to accommodate an expanding student population. We solved the problem with a part height partition creating an office space, with privacy whilst also maintaining the teams collaborative ethic.

    Read More
  • LBG East Anglian Consolidation Project

    ...we were engaged by LBG to manage and deliver a multi building exit, involving 4 receiving buildings & 7 exits, relocating IRO 200 colleagues. The project objectives were to consolidate and streamline the use of office space within the East Anglian region, as well as accommodate expanding business needs.

    Read More
  • LBG London Location Project

    Our involvement included : •    Detailed Program Management based on a  previous cubic model •    IT Data Gather / Sense check •    IT Business Analysis •    Move Delivery incl Furniture, IT, Personal & filing.

    Read More
  • RBS Bespoke Server Racks

    The Royal Bank of Scotland identified a requirement to store hundreds of IT servers within a new computer room, with a specific need to access in and around each item for the purposes of servicing and repair. After carefully evaluating …

    Read More
  • Pexhurst Medical Storage Wall

    The project involved a rolling multiphase installation amounting to some 150 units of modular storage wall. Each location had to be capable of full end user customisation due to the diverse end user business teams and work patterns involved. The …

    Read More
  • LBG Gresham st. Storage Project

    ...we provided an audit service to determine overall storage requirments, whilst supplying in excess of 600 storage cabinets and 3 mobile storage systems to complete a comprehensive storage fit out to their new flagship premises in Gresham Street, London.

    Read More
  • LBG Racking fit out

    Lloyds TSB had identified a corporate objective of integrating many of their separate business and admin departments into a single dedicated building. A prestigious new premises was created in the heart of Birmingham city at Colmore Row. This was to …

    Read More
  • CCLA Relocation

    Operating to a moderately challenging programme Cubic managed all aspects of the move including : Project Management Move Management Space Planning IT Relocation Furniture Works Supply & install of Post Room Equipment Design, supply & install of bespoke ‘agile’ lockers …

    Read More

Client Portal Login

Login below to check on project files and track assets

Forgot your password? No worries, reset your password by clicking the link below and we'll do the rest.

Reset password

New here? Welcome to register account on our website to explore all the hidden gems!

Contact us

Contact us for help, additional info or assistance and we'll be with you in no time!





captcha